CASE STUDIES
Discover our past and current projects by browsing through our case studies.
Current Projects

Excellent photographs of the 132kV solar site that GEW2 are currently working on. This is one of six 132kV projects that we currently have on the books. Following the initial design phase, the project management team is well underway with the construction build.

Excellent photographs of the 132kV solar site that GEW2 are currently working on. This is one of six 132kV projects that we currently have on the books. Following the initial design phase, the project management team is well underway with the construction build.

Excellent photographs of the 132kV solar site that GEW2 are currently working on. This is one of six 132kV projects that we currently have on the books. Following the initial design phase, the project management team is well underway with the construction build.
Case Studies
Caledon Green 33kV

GEW2 were appointed by Forsa Energy to undertake the contestable work for a SPEN approved 33kV Substation including two 33kV Ormazabal circuit breakers and install approximately 2.8km of 400mm2 Al 33kV cable from the point of connection to the SPEN 33kV Substation.
Hockliffe 33kV

GEW2 undertook the design, supply installation and commissioning of a 33kV UKPN metering substation along with the installation and testing of the 33kV cabling to the “point of connection” as per the agreed proposals and design.